- All
- Europe
-
Welds repair on EPR REACTOR
Welds repair on EPR REACTOR (GTAW/SMAW, P355NH / DN350 - DN 500) forLocation
FRANCE - FALMANVILLEYear
2018 -
Pipe installation for two new facilities for the treatment of spent nuclear fuel
Welding and assembly works (GTAW 141-142-143 e 145)Location
FRANCE - LA HAGUE / ORANOYear
2019 -
Heating, Sanitary, Ventilation and Cooling / Assembly of pipeline systems
The project has a total gross area of approximately 30,000 sqm including officesLocation
GERMANY OFFENBACHYear
2020 -
JPI – Install and welding (GTAW/SMAW) piping system
NUCLEAR POWER PLANT | JPI – Install and welding (GTAW/SMAW) piping system Client:Location
FRANCE - PENLYYear
2018 -
Install/welding piping system and sensing lines,
Install/welding piping system and sensing lines, (GTAW 141-142-143 e 145) Bilfinger Engineering &Location
FINLAND - OLKILUOTO / NUCLEAR POWER PLANTYear
2019 -
Installation of industrial pipe, prefabricate, measure, assembly, welding.
Installation of industrial pipe, prefabricate, measure, assembly. Welding 141, 141/111 normal steel, stainlessLocation
GERMANY – BP GELSENKIRCHENYear
2020 -
Install and welding (GTAW/SMAW) piping system
NUCLEAR POWER PLANT Project: Install and welding (GTAW/SMAW) piping system Client: Bilfinger EngineeringLocation
FRANCE - CATTENOMYear
2018 -
Manufacture, Welding and assembly works
Manufacture of components for the nuclear industry, Welding (GTAW/SMAW) and assembly works BilfingerLocation
FRANCE - NANCY / FIVES NORDON WORKSHOPYear
2019 -
Prefabrication, assembly, installation and welding works
Prefabrication, assembly, installation and welding works (141, 141/111 normal steel, stainless steel) Client:Location
GERMANY DORMAGEN – CHEMPARK/INEOSYear
2020